How to change position of line item on a work order
Posted: Thu Feb 08, 2018 7:49 am
For example, if you have a service package with multiple line items such as
Labor 3.5 Hours $100.00/Hour $350.00
Hose Clamp 1 Unit $1.71 Unit $ 1.71
Antifreeze / Coolant 4 Quart $2.50 / Unit $ 10.00
Engine Water Pump 1 Unit $65.94/Unit $ 89.52
and you want Engine Water Pump at the top of the list in the actual service package on the
work order instead of Hose Clamp simply use the Move To feature very similar to
Drag and Drop by selecting the line item twice and a red line will appear as an indicator
that the feature is active and you are moving line item in order of preference on the service package.
Note: If not working you may need to collapse all service packages and then expand just the one
you want to reorder.
Labor 3.5 Hours $100.00/Hour $350.00
Hose Clamp 1 Unit $1.71 Unit $ 1.71
Antifreeze / Coolant 4 Quart $2.50 / Unit $ 10.00
Engine Water Pump 1 Unit $65.94/Unit $ 89.52
and you want Engine Water Pump at the top of the list in the actual service package on the
work order instead of Hose Clamp simply use the Move To feature very similar to
Drag and Drop by selecting the line item twice and a red line will appear as an indicator
that the feature is active and you are moving line item in order of preference on the service package.
Note: If not working you may need to collapse all service packages and then expand just the one
you want to reorder.