purge estimates not working

Manager SE specific technical issues
Locked
mcdonoughtire
Member
Posts: 4
Joined: Tue Feb 02, 2016 12:26 pm

purge estimates not working

Post by mcdonoughtire »

Good afternoon. I searched before adding this thread., but it was locked. I cannot purge estimates and haven't been able to in some time. I write a good number of estimates daily, currently need to delete 100+. Version 8.0.3 Error screenshot attached.
mcdonoughtire
Member
Posts: 4
Joined: Tue Feb 02, 2016 12:26 pm

Re: purge estimates not working

Post by mcdonoughtire »

sorry, screenshot didn't post earlier.
Attachments
purge error.png
purge error.png (54.91 KiB) Viewed 2912 times
User avatar
timbre4
System Guru / Moderator
System Guru / Moderator
Posts: 4456
Joined: Tue May 25, 2004 5:47 pm
Location: TN - Volunteer State

Re: purge estimates not working

Post by timbre4 »

Thank you for posting on the forum; this type of issue is beyond the scope here and it needs to be addressed by tech support directly.

Please contact them ASAP. 888-724-6742 and follow prompts
Tim McDonnell -
Sr. Product Market Mgr / Forum Moderator / Mitchell 1 Media Developer
User avatar
Silky7
System Guru / Moderator
System Guru / Moderator
Posts: 1035
Joined: Mon Dec 31, 2007 10:07 am

Re: purge estimates not working

Post by Silky7 »

You can also try to address this yourself if so inclined. The error is saying you used ProSpect to transfer a canned job to an estimate, but never opened the estimate to process it. Given they time frame, I'd say you're looking for an estimate in late March with a DVI. Just open that one, process the pending CJ, remove the MPI and then you should be able to purge.
M1 Product Manager
mcdonoughtire
Member
Posts: 4
Joined: Tue Feb 02, 2016 12:26 pm

Re: purge estimates not working

Post by mcdonoughtire »

Silky7 wrote:You can also try to address this yourself if so inclined. The error is saying you used ProSpect to transfer a canned job to an estimate, but never opened the estimate to process it. Given they time frame, I'd say you're looking for an estimate in late March with a DVI. Just open that one, process the pending CJ, remove the MPI and then you should be able to purge.

Cleared it right up. Thanks!