LOF Promo Setup Labor Rates?
-
- Member
- Posts: 1
- Joined: Thu Sep 13, 2018 10:17 am
LOF Promo Setup Labor Rates?
I am wondering if there is a way to set different labor rates for the lof promos. Example, our labor rate for semi trucks is 97.00 an hour and our motor home labor rate is 107.00 per hour. I want to set up service packages, each package with their designated labor rate. Right now I can get the right price but it makes the end rate the same by adjusting our semi truck labor rate.
- ricmorin
- 5K Holy Smokes Contributor
- Posts: 5968
- Joined: Mon Jul 25, 2005 10:11 am
- Location: New Hampshire
- Contact:
Re: LOF Promo Setup Labor Rates?
The labor within LOF packages are fixed upon the default labor rate. You cannot select another rate set up within your system as that button is dimmed. You can manually set this up, but you'll need to update them all manually if your rate changes.
It's been discussed to allow the other rates to be available here and in Symptoms as well. Maybe someday Santa will come with a surprise.
It's been discussed to allow the other rates to be available here and in Symptoms as well. Maybe someday Santa will come with a surprise.
Ric Morin - Volunteer Forum Moderator, Shop Owner, ASE Master L1
Motorcar Alternatives, LLC
603-622-6434 x203
www.motorcaralternatives.com
I find my life is a lot easier when I use Special Orders
Motorcar Alternatives, LLC
603-622-6434 x203
www.motorcaralternatives.com
I find my life is a lot easier when I use Special Orders